West Michigan Dirtworks

Fruitport Township
Fruitport Township

(Click for gallery)

Installing 900' of 10" & 8" sanitary sewer in the Village of Fruitport. Project included new sidewalk and restoration of yards and parking lots. Fruitport, MI
Aquinas College Detention Structure
Aquinas College

(Click for gallery)

Project included removal of 160' of 78" reinforced concrete pipe and construction of a cast in place concrete multi stage outlet structure.
The Sanctuary at St. Lazare
St Lazare

(Click for gallery)

Project involved 1,900 ft of private street construction including a combined 9,100' of new sanitary sewer, storm sewer, and water main. Spring Lake, MI
Cedar Lake No. 12
Cedar Lake

(Click for gallery)

Project involved 1,860' of public street construction including a combined 8,800' of new sanitary sewer, storm sewer, and water main. Georgetown Township, MI
Creston Street: Muskegon, MI
Creston Street

(Click for gallery)

Installed 305' of 12" water main for Muskegon County. Reconstructed roadway and sidewalk.
Russel Ridge: Cedar Springs
Russel Ridge

(Click for gallery)

Excavated and placed 34,000 cubic yards of fill for the construction of a new private road. Installed 2,700 ft of storm sewer and excavated 2 large storm water detention basins.
Trade Winds: West Olive
Trade Winds

(Click for gallery)

Installed sanitary sewer, storm stewer, and watermain for new housing devolpment. Constructed road and completed mass grading. Sewer depths reached 24' with extensive dewatering required.
Mill Iron
Detention Basin. Holland, MI